Realizações

Tunnel of

Morro do Boi

Location: Tijucas

State: Santa Catarina

Country: Brasil


Setor: Special


Indicador(es): Extension of the Tunnel: 1 Km


Work Description: Performance of the tunnel in concrete, with area of section in the soil of 134.5 m², and in rock of 119 m², platform of runway of 11.10 m, besides the other complementary services. this tunnel is part of the work for duplication of BR-101 road, lots 6 and 7, in the corridor São Paulo / Curitiba / Florianópolis.

Photos
Tunnel of Morro do Boi
Tunnel of Morro do Boi
OASNetWebmailContact to OASSitemap
Go to classic version Go to mobile version